Smart Substation Upgrade
Replaced legacy protection systems with IEC 61850-based digital automation, improving fault response and remote monitoring for a 110kV substation.
18ms response
12 IEDs
Industrial PV-Storage-Charging
Designed and deployed a 5MW solar + 10MWh BESS + 20 EV chargers microgrid for a manufacturing park, cutting peak demand by 35%.
35% peak reduction
20 chargers
Data Center UPS Upgrade
Installed 4×200kVA modular UPS with active harmonic filters (APF) for a Tier III data center, achieving <3% THD and 99.999% uptime.
THD < 3%
30min backup
35kV Distribution EPC
Turnkey engineering, procurement, and construction for a 35kV substation and 12km transmission line, completed 3 months ahead of schedule.
12 km line
35 kV / 10 kV
Grid-Scale BESS Project
Delivered a 50MW/100MWh battery energy storage system for grid frequency regulation, reducing renewable curtailment by 22%.
100 MWh capacity
22% less curtailment